EN
HI

BCPL Railway Infrastructure Share price

BCPL

79.29

0.79 (1.01%)
Last updated on 12 Sep, 2025 | 15:25 IST
BUYSELL
Today's High

82.00

Today's Low

77.03

52 Week Low

60.15

52 Week High

119.91

The current prices are delayed, login to your account for live prices

BCPL Railway Infrastructure Share Key Metrics

Volume
18103.00
Market Cap
131.28 CR
LTQ@LTP
19@79.29
ATP
79.21
Var Margin
23.44 %
Circuit Range
74.58-82.42
Delivery %
0 %
Value
14.34 L
ASM/GSM
No
Market Lot
1

BCPL Railway Infrastructure Futures & Options

Data Not Found

BCPL Railway Infrastructure Corporate Actions

DateAgenda
2025-08-12Quarterly Results
2025-05-29Audited Results & Final Dividend
2025-03-28Independent Director Meeting
2025-02-07Quarterly Results

BCPL Railway Infrastructure News

BCPL Railway Infrastructure climbs on securing a LoA from Railway Vikas Nigam

Mar 05 2021 09:52:47

BCPL Railway Infrastructure rises nearly 2 per cent on securing new orders

Mar 05 2021 14:48:27
Read More

About BCPL Railway Infrastructure AboutThe

NSE : 0  
BSE : 542057  
ISIN : INE00SW01015  

The Company was originally incorporated as “Bapi Construction Electrical Engineering Private Limited” at Kolkata as a Private Limited Company under the provision of Companies Act 1956 vide Certificate of Incorporation dated December 08 1995 bearing Corporate Identification Number U51109WB1995PTC075801 issued by the Registrar of Companies West Bengal. Subsequently the name of the Company was changed to BCPL Railway Infrastructure Private Limited” vide special resolution passed by the shareholders of the Company in their meeting held on June 30 2008 and fresh Certificate of Incorporation consequent upon change of name was issued by the Registrar of Companies West Bengal on July 03 2008. the Company was then converted into a public limited Company pursuant to special resolution passed by the members at their meeting held on July 31 2008 and the name of the Company was changed to “BCPL Railway Infrastructure Limited” vide a Fresh Certificate of Incorporation dated August 05 2008 issued by the Registrar of Companies West Bengal. The Corporate Identification number of the Company is U51109WB1995PLC075801.Key Events and Milestones1995- Incorporation of the Company in the name of “Bapi Construction Electrical Engineering Private Limited”2003- Development of Bangladesh freight corridor 25 KV OHE Work at Bongaon in RHA-BNJ section of Sealdah Division of Eastern Railway2005- Design Drawing Supply erection testing and commissioning of 25 KV single phasena.c. traction overhead equipment switching station and L.T. supply transformer between Kakdwip-Namkhana section with doubling electrification work between Sonarpur-Champahati section including modification of Sonarpur feeding post of Sealdah Division in Eastern Railway.- To facilitate ttheism and ease out movement of traffic during the Ganga Sagar Mela2006- Project undertaken to develop international coaching terminal for Bangladesh - 25 Kv OHE work for Chitpur Terminal in Sealdah Division of Eastern Railway2007- 25 KV OHE work between KhrishnanagerLalgola Section of Eastern Railway under RE Kolkata- Work completed successfully before the scheduled period of completion2008- Takeover of Business of M/S U.K Construction and M/S Bapi Construction- The Company’s name changed to “BCPL Railway Infrastructure Private Limited”- The Company was converted into a public limited company and the name of the Company was changed to ? BCPL Railway Infrastructure Limited.2011- 25 KV OHE FOR RUNNI9NG OF 12 COACH EMU IN Sonarpur canning Ballygang- Budge-Budge and Baruipur- Namkhana- The Project was undertaken to improve passenger carrying capacity to ease pressure on passenger movement2012- Design Drawing Supply Erection Testing and Commissioning of 25 KV a.c.Single Phase Overhead Equipments& LT Supply Transformer for Doubling Between Chandpara to Bongaon and Karea-Kadambagachi to Sondalia in Sealdah Division of Eastern Railway.- The work was undertaken for smooth traffic movement up to Bongaon with aim of economic development by way of facilitating export shipments across the freightcorridor to Bangladesh.2012- 25 KV OHE of Tala-Princepghat section Majerhat Circular Railway- Circular rail work within the city of Kolkata.2012- Design Drawing Supply Erection Testing & Commissioning of 25 KV AC Single phase OHE Switching Station LT Supply Transformer 7 Switching Station in connection with the work of Doubling from Ghutiari Shariff to Canning in SEALDAH Division of Eastern Railway- The Work was undertaken to facilitate ttheism in the Sundarban area.- 25 KV OHE work from Tamluk to Digha- The work was undertaken to facilitate ttheism in Digha

Read More

BCPL Railway Infrastructure Management

NamePosition
Mr. Aparesh Nandi Chairman
Mr. Jayanta Kumar Ghosh Managing Director
View More

BCPL Railway Infrastructure FAQs

BCPL Railway Infrastructure शेयर का खरीद मूल्य 79.29 है। लाइव प्राइस और तत्काल ट्रेडिंग के लिए, आप अपने चॉइस ट्रेडिंग खाते में लॉगिन कर सकते हैं या चॉइस के साथ मुक्त डीमैट खाता खोल सकते हैं।

BCPL Railway Infrastructure शेयर खरीदने के लिए अपने चॉइस ट्रेडिंग खाते में लॉगिन करें, या चॉइस डीमैट खाता खोल, फिर फंड जोड़ें, कंपनी का नाम खोजें, अपना ऑर्डर टाइप चुनें और ट्रेड प्लेस करें।

BCPL Railway Infrastructure शेयर का प्राइस-टू-अर्निंग्स (पी/ई) रेशियो 22.19 है। आप सापेक्ष मूल्यांकन के लिए इसकी तुलना सेक्टर के औसत से कर सकते हैं।

BCPL Railway Infrastructure शेयर का प्राइस-टू-बुक (पी/बी) रेशियो 1.4 है। यह शेयर के मूल्य की तुलना उसकी बुक वैल्यू से करने में उपयोगी है।

BCPL Railway Infrastructure शेयर का प्राइस-टू-बुक (पी/बी) रेशियो 2.82 है। यह शेयर के मूल्य की तुलना उसकी बुक वैल्यू से करने में उपयोगी है।

BCPL Railway Infrastructure का मार्केट कैप 131.28 CR है। यह कंपनी के आकार की श्रेणी और ट्रेडिंग लिक्विडिटी को दर्शाता है।

BCPL Railway Infrastructure शेयर का 52 सप्ताह का उच्चतम और न्यूनतम मूल्य 119.91 और 60.15 है। ये मूल्य मूल्य सीमाएं, ट्रेडिंग रेंज, अस्थिरता, संभावित सपोर्ट/रेजिस्टेंस और मूल्य गति को दर्शाते हैं।